- Case File
Recent completed projects
Jobs pulled straight from the shop log, what came in, what we found and how fast it left.

01
In-frame overhaul, ISX15
Complete in-frame with new liners, rings and bearings after 1.1M miles. Returned at full spec torque.
- Mississauga
- March 2026
- 6 days

02
Fleet brake compliance program
Foundation brake and air system audit across 42 tractors, staged four units a night to keep dispatch running.
- Nashua, NH
- January 2026
- 3 weeks

03
Reefer trailer rescue
Roadside diagnosis of a failed condenser fan on a loaded produce run — load saved, truck rolling the same night.
- Brampton
- December 2025
- 5 hours

04
Fleet brake compliance program
Foundation brake and air system audit across 42 tractors, staged four units a night to keep dispatch running.
- Nashua, NH
- January 2026
- 3 weeks